Synchrophasor Sensing and Seamless Control of Smart Distribution Network with Renewable Energy Integration


Project Objective

The main objective of this project is to design and install 1 MW (peak) grid connected power system with different renewable energy sources in three different phases. It will supplement power required by NIT Meghalaya during day time and thus reduces the dependency of grid power. This will also provides real time data for analysis and installation of such power projects in the region. We can extend this project for hybrid power generation including small hydro and smart grid power management concept.

Funding Agency

REC Transmission Projects Company Limited
(A Wholly Owned Subsidiary of Rural Electrification Corporation limited)

12-21, Upper Ground Floor
Antriksh Bhawan, 22
KG Marg, New Delhi – 110001


tpcllogo

Duration of project

Stage Capacity Duration
First Phase 10 KWp Installation Within 03 Years
Second Phase 100 KWp Installation By 05 Years
Third Phase 1 MWp Installation By 06 Years